Cookie Consent by Free Privacy Policy Generator Update cookies preferences

Leak Test

Overview

The Leak Test step runs a pressure decay test. It fills the part to a set pressure, closes it off, waits for the pressure to settle, then measures how much pressure is lost over a fixed test time.

The step passes if the pressure lost (the leak) falls between the Min Leak and Max Leak limits you set. Tascus opens the vent valve at the end of every test so the part is safe to remove.

How the test works

tascus_leak_test_sequence_flow.png

The test fills the part, closes both valves to trap the air, waits for the pressure to settle, then measures the drop over the Test Time. If the part can't reach Fill Pressure within Fill Time, it fails straight away.

Step settings

All of the leak test settings are on the Leak Test step in the Sequence Editor.

Setting

What it does

Fill Mode

Which solenoid valves (SVs) are used to fill the part.

Fill Pressure

The target test pressure. Filling stops at Fill Pressure + 0.5, and the part must have reached at least Fill Pressure for the test to start.

Fill Time

The maximum time allowed to fill. If the target pressure isn't reached in this time, the test fails.

Stabilisation Time

How long to wait after the valves close before measuring starts. This lets the pressure settle after filling.

Test Time

How long the pressure is measured for. Longer times detect smaller leaks.

Min Leak

The lowest acceptable pressure drop over the test time.

Max Leak

The highest acceptable pressure drop over the test time. A larger drop means the part is leaking and fails.

Pressures and leak limits use the same units as your pressure sensor. Times are entered in minutes and seconds.

Start by testing a known good part and a known leaking part. That way you can confirm the limits separate them before you release the sequence to production.

Troubleshooting

Problem

Likely cause

What to try

Fails at the start, before testing

The part didn't reach Fill Pressure within Fill Time

Check the air supply and the fixture seals, or increase Fill Time

Good parts fail on Max Leak

Pressure hasn't settled before measuring starts

Increase Stabilisation Time

Results vary from part to part

Test Time is too short, or the part temperature varies

Increase Test Time and test parts at a consistent temperature

Good parts fail on Min Leak

Min Leak is set too high

Lower Min Leak, or set it to 0 if you only need a maximum limit

Leaking parts pass

Max Leak is too high, or Test Time is too short to see the drop

Lower Max Leak or increase Test Time

Pressure can rise slightly after the valves close as the air settles. Tascus checks for this after stabilisation and resets the start pressure if needed, so a small rise won't cause a false result.

Was this article helpful?

Thanks for your feedback!