How to Configure a Task

To set up a PM Task, it is important to follow each step from creating a location, a task, a sequence, setting configuration to trailing a Production.

Configure-A-Task.jpg

To enable PM tasks on a Tascus workstation, go to Settings > Station Setup> PM

Enable PM Status Checks, and select the correct Asset / Workstation ID

3.jpg

You can set a Time Interval from a minimum of 01 day and max of 52 weeks, ensure there is at least 1 day set as this will specify how often the task should recur.

00w:01d = Once per day

52w:00d = Once per year

01w:00d = Once per week

PM Tasks can be configured as Checklists or Sequences.

4.jpg

5.jpg

Pm=Fail logic only works when running the sequence from completing a PM task. It does not work from Trial Run Sequence. 

Tasks can be configured to a Location within the settings

image.png

7.jpg

8.jpg